R&D | |
| |
| |
| Component specification |
·Not all the PCB can match the machine perfectly, though they can work the machine, we say they are basically usable.
·We look for the perfect matched PCB through lots of experiments and testing before mass production
·It takes 26 days to match a set of the components |
|
| |
| PCB design |
·PCB design based on completing the match of components
·PCB design needs considering the standard size of the SMT line, and satisfying EMC requirement
·It takes 27 days to finish the design of PCB |
|
| |
| Structure & technics analysis |
·Our engineers design each component’s structure according to their experience
·To assure the successful production, we would analize, try assembling, double check the design and improve the technics before opening the mould
·It takes 19 days to finish a three-stage structure & technics analysis |
 |  |  |
 | Structure & technics analysis |  |
| |  |
 |
|
| |
| Structure design |
·After appearance design confirmed, structure design is made by Pro-E, a 3D software
·Since CD-2800, CODYSON invented a new tightening mold for the inner tank, which was followed by many competitors.
·CODYSON has top senior tooling engineers, who can design the simplest structure to fit the mass production very well
·CODYSON is specially good at deciding the reasonable gap between the structural |
|
| |
| Tooling analysis |
·CODYSON has senior tooling experience, to assure the mould’s life and quality, we purchase and check all materials of the mould(including mould frame, embeded material, copper electrode , etc…) before send to the tooling factories
·CODYSON would check each tooling drawing, specially pay attention to the processes, such as plastic injection, smooth depaning, layout of the cooling water, angle of removing the mould.
·It takes 67 days from tooling design to injection confirmed. |
| |  |
| |  |
|
|  |
 |
| |  |
 |
|  |